Before you touch the document
- Confirm the SSP is convertible. A convertible SSP has one addressable implementation statement per requirement. If yours is narrative prose organized by chapter, restructure it under Rev. 2 first, because the crosswalk maps one statement at a time.
- Freeze a Rev. 2 baseline copy. Version and archive the current SSP as the of-record document for active Rev. 2 contracts. Conversion happens on a branch, never in place.
- Inventory which contracts need which view. Your contract mix decides which versions of the SSP the conversion must produce.
The five conversion passes
- Pass 1: structure mapping. Rebuild the skeleton on the 17 Rev. 3 families. Two moves catch people out: the SSP requirement itself moves into the new Planning family, and Security Assessment becomes Security Assessment & Monitoring.
- Pass 2: statement conversion. Walk the crosswalk requirement by requirement. Carried requirements keep their statements with updated citations; consolidated requirements get merged statements that preserve each parent's substance; new requirements get placeholders that state the gap honestly.
- Pass 3: disposition records. Every requirement gets a recorded disposition: satisfied as-is, satisfied with modification, gap (with POA&M entry), or not applicable with rationale. The disposition table becomes the audit trail for the transition.
- Pass 4: ODP embedding. Each implementation statement that touches a parameter cites the ODP register value inline. An SSP that contradicts its own register fails the easiest check an assessor can run.
- Pass 5: evidence re-pointing. Statements reference evidence by Rev. 3 assessment-objective index (see the evidence guide), so the document and the artifact library stay in sync.
Maintaining both views
Until your last Rev. 2 contract closes out, both documents have to stay accurate at the same time. The pattern that works makes the Rev. 3 SSP primary and maintains the frozen Rev. 2 SSP as a derived view, with changes flowing through the crosswalk so each update lands in both. Two documents edited independently diverge within a quarter. The full operating model is in dual-baseline operations.
SSP conversion is Station 03 of our Rev. 3 transition.
We run all five passes (structure mapping, statement conversion, dispositions, ODP embedding, and evidence re-pointing) on a fixed scope and keep your Rev. 2 view intact. Or email rj@indirectit.com directly.